Alderman Maarten van Poelgeest says that he was not aware of the personnel problems of the Municipal Service for the Environment and Building Supervision. This has led to a lack of control of construction the new subway system. After two incidents of soil caving in and water leakage, construction has been halted.
www.parool.nl/parool/nl/1084/Dossier-Noord-Zuidlijn/article/detail/74042/2008/12/11/Drama-NZ-lijn-verraste-stadhuis.dhtml
www.parool.nl/parool/nl/1084/Dossier-Noord-Zuidlijn/article/detail/74042/2008/12/11/Drama-NZ-lijn-verraste-stadhuis.dhtml
No comments:
Post a Comment